What's in this guide

  1. Why decorators lose to the cheaper quote
  2. Cost the preparation, do not absorb it
  3. The paint schedule that sells the job
  4. Measuring and coverage
  5. Inclusions and exclusions
  6. Payment terms and materials
  7. Common mistakes that lose decorating work
  8. Copy-paste decorating quote template

Why decorators lose to the cheaper quote.

A customer looking at two decorating quotes, one at £1,800 and one at £2,600, sees the same rooms and two different numbers. Nothing in front of them explains the gap, so they assume the expensive one is greedy.

The gap is almost always preparation. Filling, sanding, caulking, stain blocking, two coats instead of one, better paint. All of it invisible on the day and obvious after eighteen months.

Your quote is the only chance you get to make that visible before the decision is made. Write it so the customer can see what the cheaper price leaves out.

Cost the preparation, do not absorb it.

Most decorators fold preparation into a single figure. That is exactly what makes it invisible.

List it as its own priced line, and describe what it covers: filling and making good, sanding, caulking joints, cleaning down, masking and protection, stain blocking where needed, priming bare or repaired areas.

Two useful things happen. The customer understands where the money goes, and if they want to reduce the price they can drop a room, not your prep.

Not sure your day rate covers everything? The free day-rate workbook works out what you need to charge once holidays, the van, insurance and unpaid quoting time are counted. It is free.

The paint schedule that sells the job.

This is the single strongest thing a decorator can put in a quote, and almost nobody does it. Set out, surface by surface, what you are applying.

For each surface state the product, the finish and the number of coats:

Now the customer comparing your quote with a cheaper one has something concrete to compare. If the other quote does not say, they will start asking why.

Measuring and coverage.

Price from measurements, not from a walk-round and a feeling. Take the wall and ceiling areas, note the number of doors, frames, skirting runs and windows, and note the condition of each surface.

Use the manufacturer's stated coverage for the products you are actually using, and allow for the fact that the first coat on bare, repaired or strongly coloured surfaces will cover less than the tin claims. Add a sensible allowance rather than discovering it on site.

Condition drives labour more than area does. A newly plastered room and a Victorian hallway with twenty years of gloss are not the same job at the same square metre rate, and your quote should show that.

Inclusions and exclusions.

Decorating disputes are nearly always about what was moved, what was covered and what was found underneath. Put it in writing:

Payment terms and materials.

On a full house, materials alone can be a serious outlay. Take a deposit that covers materials on acceptance, particularly where the customer has chosen specific or premium products that you cannot use elsewhere.

For longer jobs, an interim payment part way through is normal. State when the balance is due, in days, and whether you or the customer is supplying the paint. If they supply it, say plainly that you cannot guarantee the finish of a product you did not choose.

Common mistakes that lose decorating work.

Copy-paste decorating quote template.

[YOUR BUSINESS NAME]
[Address] · [Phone] · [Email]
[Accreditation, if held] · Public liability: £[ ]

QUOTATION
Quote no: [Number] · Date: [Date] · Valid until: [Date + 30 days]

FOR: [Customer name], [Address of works]

SCOPE OF WORKS
[Room by room: e.g. Hallway, stairs and landing. Walls, ceiling, woodwork.]

PREPARATION (included)
Filling and making good, sanding, caulking, cleaning down,
masking and floor protection, stain blocking and priming as required.
Preparation ................................. £[ ]

PAINT SCHEDULE
Ceilings: [product], matt, 2 coats
Walls: [product], [finish], 2 coats
Woodwork: [primer / undercoat / topcoat], [finish], 2 coats

PRICE
Labour, [X] days ............................ £[ ]
Materials ................................... £[ ]
Preparation (as above) ...................... £[ ]
Subtotal .................................... £[ ]
VAT [if applicable] ......................... £[ ]
TOTAL ....................................... £[ ]

NOT INCLUDED
[Plaster repairs beyond minor filling] [Wallpaper stripping]
[Moving large furniture] [Lead paint or damp, if found]

PAYMENT TERMS
Deposit of £[ ] on acceptance to cover materials.
Balance due [X] days from completion.

GUARANTEE
Workmanship guaranteed for 12 months from completion.
Where materials are supplied by the client, the finish cannot be guaranteed.

Accept this quote by replying to this email.
Questions: [Phone] or [Email].

Stop rewriting your quote every time.

The Trade Pack gives you the proposal template, the day 2 / day 5 / day 10 follow-up sequence, a pricing calculator and the paperwork, written for your trade. Word and Excel. One payment, no subscription.

Choose your trade

What to do next.

Add a preparation line and a paint schedule to your next quote. Those two changes alone put you in a different category from the number scribbled on the back of a card.

Then follow it up at day 2, day 5 and day 10. Decorating decisions drift more than any other trade, and a polite nudge on day 5 wins work that had simply been forgotten about.